A commercial kitchen refit goes well or badly long before the first bench is delivered. These are the seven decisions that shape the cost, the programme and how the kitchen works afterwards.
1. The menu and the number of covers
Equipment follows the menu. A kitchen built for a grill menu is laid out differently from one built around a pizza oven or a cook-chill operation. Fix the menu style and the peak number of covers first, and say whether either is likely to change.
2. Workflow
Food should move in one direction: goods in, storage, preparation, cooking, the pass, then wash-up, without raw and cooked crossing. Walk through a busy service on the plan. Every extra step and every crossing point costs time in every service for the life of the kitchen.
3. Services
Gas, electricity, water and drainage decide what is possible. Check the size of the incoming gas and electrical supplies early. Upgrading them can take longer than the rest of the refit. Drainage falls and grease management need to be known before the floor is designed.
4. Extraction
The route for the extract duct, and where it discharges, is often the hardest part of a refit, particularly in a leased or listed building or one with neighbours close by. Settle it before signing a lease if you can. Our guide to kitchen extraction explains what is involved.
5. Fabrication: made to measure or from a catalogue
Standard benches and sinks suit a simple rectangular room. Awkward walls, columns and tight passes usually need made-to-measure stainless, which uses the space fully and leaves fewer gaps to clean. Decide which areas justify it.
6. Programme
Agree how long the kitchen can be closed, and whether the work can be phased around trading. Made-to-measure items need time in the workshop before they reach site, so the order has to be placed well ahead of the closure.
7. Compliance and handover
Decide at the start what paperwork you need at the end: gas certificates, electrical certificates, ventilation design and commissioning figures, and operating manuals. It is far easier to collect these as the job goes than to chase them afterwards.
What to bring to a first meeting
- A floor plan, even a rough one with dimensions
- The menu and expected covers
- Photographs of the existing kitchen and services
- Your opening date and any lease conditions
We have been defining commercial kitchens since 1990, and the first conversation costs nothing. Tell us about your project.


